DCT

Railway Services

kolej_gora3DCT Gdansk container terminal has an on-site 2 track facility where containers can be handled to and from rail wagons. The facility has a 1.000 m long railway siding able to accommodate unusually long block trains without the need to split the train. The rail facility is connected to the Polish standard gauge rail network via the large sidings at the Northern Port of Gdansk which is established as the final statutory destination of the trains. The rail block trains provide scheduled deliveries to and from major inland distribution depots throughout Poland and neighbouring countries.

DCT Rail Terminal is open to discuss possibilities with all accredited rail operators and carriers. Currently three carriers: PKP Cargo, Lotos Kolej. and CTL Logistics signed up to use this facility and provide regular services. Internal rail procedures are implemented in order to provide the most efficient service at the siding.

DCT Gdansk’s Railway Coordination Office support available 24h:
Tel: (+48) 58 737 7732
Mob: +48 609 802 366
Email:  rail@dctgdansk.com

DCT